- Asbestos Removal (1 Confined Area, Applications: Embedded Asbestos-Cement Elements) - Site Cleaning (Clearing, Collection Of Various Non-Contaminated Waste, Asbestos-Cement Elements, Etc.) - Cleaning Of Existing Buildings (Dismantling Of Various Installations) - Deconstruction Of Existing Buildings Into Asbestos-Cement, Reinforced Concrete, Wood And Steel Elements: O Piggery Building Called "Stall": Approx. 11,700 M³ On Approx. 1,225 M² Base, Including Tank Below The Building O Annex Building Called "Schuppen": Approx. 1,400 M³ On Approx. 280 M² Base - Removal Of Asphalt Coating, Removal Of Fuel Tank - Backfilling Of Excavation - Waste Management Expected Duration: - Asbestos Removal In Confined Area: Approx. 10 Days - Deconstruction Including Asphalt Removal And Backfilling: Approx. 3 Months Execution Period: - April – June/July 2025
プロポーザル要請(Request For Proposals)
より正確な最新の情報をウェブ サイトにお届けするように万全を期していますが、すべての情報にエラーがないとは限りません。
この通知の更新/修正に提案がある場合は、どうぞお知らせください。