検索

Design, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under ?Har Ghar nal Ka Jal? nischay yojna in areas having no ground water quality issues; with Electric Driven Pumps in the District of Chapra(Saran) Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under Mukhyamantri Grameen Peyjal Nishchay Yojna (Non-Quality Affected) in Block- Garkha, (1) Panchayat- Garkha, Ward no-1,3,4,( 2) Panchayat- Bajitpur, Ward no-2&3 under P.H.Division, Chapra

調達プラン

一般情報

   9月 23, 2024
   英語
   その他
   発行されました: 9月 23, 2024

原本

3 71746 Design, Construction, Supply, Testing and Commissioning of Piped Water Supply Schemes for habitations left out under “Har Ghar nal Ka Jal” nischay yojna in areas having no ground water quality issues; with Electric Driven Pumps in the District of Chapra(Saran) Bihar on turn-key basis with 6 months Trial Run Period and Comprehensive Operation and Maintenance of 60 months under...
購読オプション

基本

完全

企業

550ドル/年

1000ドル/年

コスト リクエスト中

購入 購入 連絡先
この通知はお客様の情報用であることに、注意してください。
より正確な最新の情報をウェブ サイトにお届けするように万全を期していますが、すべての情報にエラーがないとは限りません。
この通知の更新/修正に提案がある場合は、どうぞお知らせください。