検索

China-Beijing: EIB - Supply, installation and commissioning of 31 gas-fired heat boilers

プロポーザル要請(Request For Proposals)

一般情報

中国
   BEIJING
   6月 14, 2017
   7月 26, 2017
   英語
   その他

物品, サービス

セントラルヒーティング・ボイラー   ボイラー設備   温水ボイラー   ウォーターボイラー   セントラルヒーティング・ボイラーの部品   ボイラーの設置   ボイラー用補助プラント   ラジエーター   送水ポンプ   避雷工事  

原本

IN THE OFFICIAL JOURNAL OF THE EUROPEAN UNION (OJEU)
INTERNATIONAL INVITATION FOR TENDERS
HOHHOT ENERGY EFFICIENCY PROJECT UTILIZING EUROPEAN INVESTMENT BANK LOAN BOILER HOUSE UPGRADING 2017 CONTRACT I AND CONTRACT II

Hohhot Gas Heating Co. Ltd.

The Hohhot Gas Heating Co., Ltd. (hereinafter referred to as “the Borrower”) has applied for a loan from the European Investment Bank-EIB (hereinafter referred to as “the Bank”) towards the cost of the Hohhot Energy Efficiency Project. This International Invitation for Tenders related to the contracts of Boiler House Upgrading 2017 Contract I and Contract II.

The two contracts will include:

Contract I (Contract No.2017-2-E) supplies, installs and commissions 15 sets of "coal to gas" equipment for upgrading boiler houses, including gas-fired boilers (including burner and flue gas condenser), chimneys, circulation pumps, replenishing water pumps, plate heat exchanger units, electrical system, lighting and lightning protection grounding equipment, automatic control system, instruments and meters, dust separators, full automatic water desalination units and soft water tanks, pipelines, fittings (including supports and hangers), valves, air inlet and exhaust and noise reducing equipment, radiators, water supply and drainage pipelines and accessories, and incidental services.

Contract II (Contract No.2017-3-E) supplies, installs and commissions 16 sets of "coal to gas" equipment for upgrading boiler houses, including gas-fired boilers (including burner and flue gas condenser), chimneys, circulation pumps, replenishing water pumps, plate heat exchanger units, electrical system, lighting and lightning protection grounding equipment, automatic control system, instruments and meters, dust separator, full automatic water desalination units and softened water tanks, pipelines, fittings (including supports and hangers), valves, air inlet and exhaust and noise reducing equipment, radiators, water supply and drainage pipelines and accessories, and incidental services.

The contracts are expected to be implemented from 31 July, 2017 to 15 October, 2019.

Bidders could bid for one of contracts or both contracts.

購読オプション

基本

完全

企業

550ドル/年

1000ドル/年

コスト リクエスト中

購入 購入 連絡先
この通知はお客様の情報用であることに、注意してください。
より正確な最新の情報をウェブ サイトにお届けするように万全を期していますが、すべての情報にエラーがないとは限りません。
この通知の更新/修正に提案がある場合は、どうぞお知らせください。